1. ആമുഖം

This manual provides essential instructions for the installation, operation, and maintenance of the BFT SB-BAT P125002 24V DC Battery Backup Kit. This kit is designed to ensure continuous operation of compatible BFT gate openers during temporary power outages. Please read this manual thoroughly before proceeding with installation or use.

2. ഉൽപ്പന്നം കഴിഞ്ഞുview

The BFT SB-BAT P125002 is a 24V DC battery backup system that integrates with specific BFT gate operators. It includes a smart charger board that manages battery charging when main power is available and automatically switches to battery power when the main supply is interrupted.

BFT SB-BAT P125002 Battery Backup Kit components in box

ചിത്രം 1: ഓവർview of the BFT SB-BAT P125002 Battery Backup Kit, showing the product box, two batteries, wiring, and mounting hardware.

2.1 കിറ്റ് ഘടകങ്ങൾ

Individual components of the BFT SB-BAT P125002 Battery Backup Kit

ചിത്രം 2: വിശദമായി view of the BFT SB-BAT P125002 kit components, including batteries, wiring, mounting brackets, and the battery holder.

3 അനുയോജ്യത

This battery backup system is compatible with the following BFT gate operator series:

Ensure your gate operator model is listed above for proper functionality.

4. സജ്ജീകരണവും ഇൻസ്റ്റാളേഷനും

Installation of the BFT SB-BAT P125002 kit is designed to be straightforward. However, it is recommended that installation be performed by a qualified technician to ensure safety and correct operation. Always disconnect main power to the gate operator before beginning installation.

4.1. സുരക്ഷാ മുൻകരുതലുകൾ

4.2. ഇൻസ്റ്റലേഷൻ ഘട്ടങ്ങൾ (പൊതു മാർഗ്ഗനിർദ്ദേശങ്ങൾ)

  1. Mount the Battery Holder: Secure the battery holder/mounting base within the gate operator's control box or an appropriate enclosure using the provided mounting brackets and fasteners. Ensure it is stable and accessible.
  2. ബാറ്ററികൾ ചേർക്കുക: Place the two 12V 1.2Ah batteries into the battery holder.
  3. ബാറ്ററികൾ ബന്ധിപ്പിക്കുക: Connect the batteries in series to achieve 24V DC, following the wiring diagram provided with your specific gate operator or the kit's smart charger board. Ensure correct polarity.
  4. Connect Smart Charger Board: Integrate the smart charger board into the gate operator's control unit. Refer to your gate operator's manual for the specific connection points for the battery backup system.
  5. സുരക്ഷിത വയറിംഗ്: Route and secure all wiring to prevent pinching or damage.
  6. പവർ പുന ore സ്ഥാപിക്കുക: Once all connections are verified and secure, restore main power to the gate operator. The smart charger board will begin charging the batteries.
  7. ടെസ്റ്റ് സിസ്റ്റം: Perform a power outage simulation to verify the battery backup system activates correctly and powers the gate operator.

5. പ്രവർത്തന നിർദ്ദേശങ്ങൾ

The BFT SB-BAT P125002 operates automatically once installed correctly.

5.1. Normal Operation (Power On)

When main power is supplied to the gate operator, the smart charger board within the SB-BAT kit continuously monitors the battery charge level. It will charge the batteries as needed to maintain them at full capacity.

5.2 പവർ ഔtage Operation (Power Off)

ഒരു പവർ ഈ സാഹചര്യത്തിൽtage, the smart charger board automatically detects the loss of main power and switches the gate operator to battery power. The gate operator will then function normally using the stored energy in the batteries. The duration of operation on battery power depends on the frequency of gate usage and the charge level of the batteries.

6. പരിപാലനം

Regular maintenance ensures the longevity and reliability of your battery backup system.

6.1. ബാറ്ററി റീചാർജിംഗ്

ഒരു ശക്തിക്ക് ശേഷംtage, once main power is restored, the smart charger board will automatically begin recharging the batteries. A full recharge typically takes 12 മുതൽ 14 മണിക്കൂർ വരെ. It is important to allow sufficient time for batteries to fully recharge after use.

6.2. Fuse Check

സിസ്റ്റത്തിൽ എ ഉൾപ്പെടുന്നു 20എ ഫ്യൂസ് for protection. If the battery backup system fails to operate or charge, inspect the fuse for continuity. Replace with a fuse of the exact same rating if necessary. Always disconnect power before checking or replacing fuses.

6.3. ബാറ്ററി ലൈഫും മാറ്റിസ്ഥാപിക്കലും

Batteries have a finite lifespan. Periodically test the system by simulating a power outage to ensure batteries hold a charge and can power the gate operator. If performance degrades significantly, consider replacing the batteries. Use only recommended replacement batteries (2x 12V 1.2Ah sealed lead-acid).

7. പ്രശ്‌നപരിഹാരം

If your BFT SB-BAT P125002 battery backup system is not functioning as expected, consider the following:

For persistent issues, contact BFT technical support or a qualified service technician.

8 സ്പെസിഫിക്കേഷനുകൾ

ഫീച്ചർസ്പെസിഫിക്കേഷൻ
മോഡൽ നമ്പർP125002
ബാറ്ററി തരംസീൽഡ് ലെഡ്-ആസിഡ്
ബാറ്ററി ശേഷി2x (12V 1.2Ah)
Putട്ട്പുട്ട് വോളിയംtage24V DC (nominal)
ചാർജ് വോളിയംtage27.2V
കറൻ്റ് ചാർജ് ചെയ്യുക130mA
ബാറ്ററി റീചാർജ് ചെയ്യുന്ന സമയം12-14 മണിക്കൂർ
Exhausted Battery Protection Threshold20.4V
ഫ്യൂസ് റേറ്റിംഗ്20എ
പ്രവർത്തന താപനിലData detected with external temperature of: 25°C (77°F)

9. വാറൻ്റിയും പിന്തുണയും

For warranty information, please refer to the documentation provided with your original purchase or contact BFT customer support directly. For technical assistance, installation queries, or troubleshooting beyond the scope of this manual, please contact your authorized BFT dealer or BFT technical support.

BFT Contact Information: Please visit the official BFT webഏറ്റവും പുതിയ കോൺടാക്റ്റ് വിശദാംശങ്ങൾക്കും പിന്തുണാ ഉറവിടങ്ങൾക്കുമുള്ള സൈറ്റ്.

അനുബന്ധ രേഖകൾ - P125002

പ്രീview BFT DEIMOS BT UL/CSA Electromechanical Gate Automation System
Discover the BFT DEIMOS BT UL/CSA, an electromechanical automation system for rack sliding gates. Featuring smart technology, 24V safe operation, and simplified installation, this system enhances gate security and convenience. Explore its technical specifications and available accessories for residential and commercial applications.
പ്രീview BFT Mitto 2M/4M റിമോട്ട് കോഡിംഗ് നിർദ്ദേശങ്ങൾ: ഒരു സമഗ്ര ഗൈഡ്
ഗാരേജ്, ഗേറ്റ് ഓപ്പണറുകൾക്കായി നിങ്ങളുടെ BFT Mitto 2M, 4M റിമോട്ട് കൺട്രോളുകൾ എങ്ങനെ പ്രോഗ്രാം ചെയ്യാമെന്ന് മനസിലാക്കുക. ഡിജിറ്റൽ സ്‌ക്രീനുകൾ ഉള്ളതും ഇല്ലാത്തതുമായ റിസീവറുകൾക്കുള്ള കോഡിംഗ്, പ്രധാനപ്പെട്ട സുരക്ഷാ മുന്നറിയിപ്പുകൾ ഉൾപ്പെടെ ഈ ഗൈഡ് ഉൾക്കൊള്ളുന്നു.
പ്രീview BFT VIRGO Swing Gate Automation Installation Manual
Comprehensive installation and user guide for the BFT VIRGO swing gate automation system, covering safety, technical specifications, installation procedures, programming, and maintenance.
പ്രീview മാനുവൽ ഡി ഇൻസ്റ്റാളേഷൻ ഇ യൂസോ BFT GIOTTO 30-60 S BT / GIOTTO 30-60 BT
ഗൈഡ കംപ്ലീറ്റ പെർ എൽ'ഇൻസ്റ്റാൾസിയോൺ ഇ ലുട്ടിലിസോ ഡെല്ലെ ബാരിയറെ ഓട്ടോമാറ്റിക് ബിഎഫ്ടി ജിയോട്ടോ 30-60 എസ് ബിടി ഇ ജിയോട്ടോ 30-60 ബിടി. സ്‌പെസിഫിക് ടെക്‌നിഷ്, കോൺഫിഗറേഷൻ ഇ മാനുറ്റെൻസിയോൺ എന്നിവ ഉൾപ്പെടുത്തുക.
പ്രീview BFT MITTO 2B റിമോട്ട് കോഡിംഗ് നിർദ്ദേശങ്ങൾ | റെട്രോ റിമോട്ടുകൾ
ഗേറ്റ് ഓപ്പണറുകൾക്കായി BFT MITTO 2B റിമോട്ടുകൾ കോഡ് ചെയ്യുന്നതിനുള്ള ഘട്ടം ഘട്ടമായുള്ള ഗൈഡ്, നിലവിലുള്ള റിമോട്ട്, റിസീവർ LCD സ്ക്രീൻ രീതികൾ ഉൾക്കൊള്ളുന്നു. ട്രബിൾഷൂട്ടിംഗ് നുറുങ്ങുകൾ ഉൾപ്പെടുന്നു.
പ്രീview BFT CLONIX1-2 & MITTO 2-4 433MHz റേഡിയോ കൺട്രോൾ സിസ്റ്റം ഇൻസ്റ്റലേഷൻ ഗൈഡ്
BFT CLONIX1-2 റിസീവർ, MITTO 2-4 433MHz റേഡിയോ കൺട്രോൾ ട്രാൻസ്മിറ്ററുകൾ എന്നിവയ്‌ക്കായുള്ള സമഗ്രമായ ഇൻസ്റ്റാളേഷൻ ഗൈഡ്, ഗേറ്റ്, ഡോർ ഓട്ടോമേഷനായുള്ള പ്രോഗ്രാമിംഗ്, ക്ലോണിംഗ്, സുരക്ഷ, സാങ്കേതിക സവിശേഷതകൾ എന്നിവ ഉൾക്കൊള്ളുന്നു.